The rules library · in the open
Sources and verification
Last read · 2026-09-09Every sentence on this site that states a rule carries a section number. This page is the list behind those numbers: 40 entries from 40 CFR part 84, each with the primary source it was read from and the date it was read. The engine takes its thresholds and clocks from these entries and nowhere else; a page cannot cite what this list lacks.
| Section | Rule | Requirement, in plain words | Figure | Read |
|---|---|---|---|---|
| 40 CFR 84.106(a) | Applicability: full charge | The leak repair section applies to refrigerant-containing appliances with a full charge of 15 or more pounds of refrigerant. | 15 lb | 2026-09-04 |
| 40 CFR 84.106(a)(1), (a)(2) | Applicability: refrigerant | The refrigerant must contain a regulated substance (an HFC) or a substitute with a global warming potential greater than 53, using the GWPs in table 1 of 40 CFR 84.64(b). | 53 gwp | 2026-09-04 |
| 40 CFR 84.106(a)(3) | Applicability: exclusions | The section does not apply to appliances containing solely an ozone-depleting substance as the refrigerant, or to appliances in the residential and light commercial air conditioning and heat pump subsector. | 2026-09-04 | |
| 40 CFR 84.106(a)(4) | Effective date | The requirements of the leak repair section apply as of January 1, 2026. | 2026-09-04 | |
| 40 CFR 84.106(b) | Calculate the leak rate on every addition | The owner or operator must calculate the leak rate every time refrigerant is added to an appliance, unless the addition immediately follows a retrofit or a new installation, or qualifies as a seasonal variance. The person adding the refrigerant must give the owner or operator documentation of the service. | 2026-09-04 | |
| 40 CFR 84.102 (leak rate, method 1); 84.106(b)(1) | Annualizing method | Pounds added to return the appliance to full charge, divided by the full charge; divided by the shorter of the days since the last addition or 365, divided by 365; times 100. The first calculation after January 1, 2026 substitutes 365 days. | 2026-09-04 | |
| 40 CFR 84.102 (leak rate, method 2); 84.106(b)(2) | Rolling average method | The sum of the pounds added over the previous 365 days (or since the last successful follow-up verification test, if sooner), divided by the full charge, times 100. The first calculation after January 1, 2026 uses pounds added since that date. | 2026-09-04 | |
| 40 CFR 84.102 (leak rate) | One method per facility | The same leak rate method must be used for all appliances subject to leak repair at an operating facility. | 2026-09-04 | |
| 40 CFR 84.106(c)(2)(i) | Leak rate limit: commercial refrigeration | 20 percent leak rate for commercial refrigeration appliances. | 20% | 2026-09-04 |
| 40 CFR 84.106(c)(2)(ii) | Leak rate limit: industrial process refrigeration | 30 percent leak rate for industrial process refrigeration appliances. | 30% | 2026-09-04 |
| 40 CFR 84.106(c)(2)(iii) | Leak rate limit: comfort cooling and other | 10 percent leak rate for comfort cooling appliances, refrigerated transport appliances, and any other covered appliance not in the first two categories. | 10% | 2026-09-04 |
| 40 CFR 84.106(c)(1), (d) | Repair within 30 days | Leaks must be identified and repaired within 30 days of the refrigerant addition that exceeded the applicable leak rate (120 days if an industrial process shutdown is required). Repairs must be made by a certified technician. | 30 days | 2026-09-04 |
| 40 CFR 84.106(d) | Repair within 120 days with an industrial process shutdown | Where an industrial process shutdown is required, the repair period is 120 days instead of 30. | 120 days | 2026-09-04 |
| 40 CFR 84.106(e)(1) | Initial verification test | An initial verification test must be performed within 30 days (120 with an industrial process shutdown) of exceeding the leak rate, after the repair and before refrigerant is added back. | 30 days | 2026-09-04 |
| 40 CFR 84.106(e)(2) | Follow-up verification test | A follow-up verification test must be performed within 10 days of the successful initial verification test, or within 10 days of the appliance returning to normal operating characteristics and conditions if it was evacuated for the repair. | 10 days | 2026-09-04 |
| 40 CFR 84.106(g)(1)(i) | Leak inspections: 500 pounds or more | Commercial and industrial process refrigeration appliances with a full charge of 500 pounds or more that have exceeded the leak rate must be inspected once every three months after a successful follow-up verification test, until the leak rate calculations show four quarters in a row under the limit. | 500 lb | 2026-09-04 |
| 40 CFR 84.106(g)(1)(ii) | Leak inspections: 15 to 500 pounds | Commercial and industrial process refrigeration appliances with a full charge of 15 or more but less than 500 pounds that have exceeded the leak rate must be inspected once per year after a successful follow-up verification test, until the calculations show one year under the limit. | 2026-09-04 | |
| 40 CFR 84.106(g)(1)(iii) | Leak inspections: comfort cooling and other | Comfort cooling and other covered appliances that have exceeded the leak rate must be inspected once per year after a successful follow-up verification test, until the calculations show one year under the limit. | 2026-09-04 | |
| 40 CFR 84.106(h)(1), (h)(5)(i) | Retrofit or retirement plan | A retrofit or retirement plan must be created within 30 days when the owner or operator elects not to repair, takes no action, or repairs fail to bring the rate under the limit; the work must be finished within one year of the plan's date. | 30 days | 2026-09-04 |
| 40 CFR 84.106(j), (m)(4) | Chronically leaking appliances | An appliance containing 15 or more pounds that leaks 125 percent or more of its full charge in a calendar year must be reported to the EPA by March 1 of the following year. | 125% | 2026-09-04 |
| 40 CFR 84.106(l), (l)(1) | Records kept three years | All leak repair records must be kept for at least three years, in electronic or paper format. Appliance records are kept until three years after the appliance is retired. | 3 years | 2026-09-04 |
| 40 CFR 84.106(l)(1) | Determine and record the full charge | By January 1, 2026, or on installation, the owner or operator must determine the full charge of every covered appliance and keep: the owner or operator, the address, the full charge and how it was determined, any revisions, and the installation date. | 2026-09-04 | |
| 40 CFR 84.106(l)(2) | The service record | For each installation, service, repair or disposal: the appliance and its location, the date, the parts worked on, the type of work, the name of the person who did it, the amount and type of refrigerant added or removed, the full charge, and the leak rate and the method used. | 2026-09-04 | |
| 40 CFR 84.106(l)(4) | The technician hands the owner the record | If the work is done by someone other than the owner or operator, that person must provide the owner or operator with a record of the appliance, the date, the parts, the type of work, who did it, and the refrigerant added or removed. | 2026-09-04 | |
| 40 CFR 84.106(l)(7) | Verification test records | Records of the dates and results of every initial and follow-up verification test, the repaired leaks tested, and the test methods; the technician provides this documentation on conclusion of the service. | 2026-09-04 | |
| 40 CFR 84.108(a) | Automatic leak detection: 1,500 pounds or more | Industrial process and commercial refrigeration appliances with a full charge of 1,500 pounds or more of a covered refrigerant must install and use an automatic leak detection system. | 1500 lb | 2026-09-04 |
| 40 CFR 84.108(b) | Automatic leak detection: dates | Appliances installed on or after January 1, 2026 need the system on installation or within 30 days; appliances installed from January 1, 2017 to December 31, 2025 need it by January 1, 2027. | 2026-09-04 | |
| 40 CFR 84.102 (full charge) | How full charge is determined | One or a combination of: the manufacturer's determination; calculation from component sizes, refrigerant density and piping volume; actual measurement of refrigerant added or evacuated; or an established range, whose midpoint serves as the full charge. | 2026-09-04 | |
| 40 CFR 84.102 (seasonal variance); 84.106(b) | Seasonal variance | Refrigerant removed for a change of season and added back in an amount no greater than what was removed, both within one 12-month period, is not a leak-rate addition. | 2026-09-04 | |
| 40 CFR 84.102 (refrigerant-containing appliance) | Definition: refrigerant-containing appliance | A refrigerant-containing appliance is any device that contains and uses a regulated substance or a substitute as a refrigerant, including any air conditioner, refrigerator, chiller or freezer. For devices with multiple circuits, each independent circuit is a separate appliance. | 2026-09-09 | |
| 40 CFR 84.102 (commercial refrigeration) | Definition: commercial refrigeration | Commercial refrigeration means the refrigerant-containing appliances used in the retail food and cold storage warehouse subsectors. Retail food appliances include those found in supermarkets, convenience stores, restaurants and other food service establishments. | 2026-09-09 | |
| 40 CFR 84.102 (comfort cooling) | Definition: comfort cooling | Comfort cooling means the refrigerant-containing appliances used for air conditioning to control heat or humidity in occupied facilities, including chillers, commercial split systems, dual-function heat pumps and packaged roof-top units. | 2026-09-09 | |
| 40 CFR 84.106(g)(2) | Leak inspections: who and how | Leak inspections must be conducted by a certified technician using the method or methods the certified technician determines to be appropriate for that appliance. | 2026-09-09 | |
| 40 CFR 84.106(g)(3) | Leak inspections: what is inspected | All visible and accessible components must be inspected, except components that are insulated, under ice, underground, behind walls or otherwise inaccessible; where personnel must be elevated more than two meters; or where components are unsafe to inspect as determined by site personnel. | 2026-09-09 | |
| 40 CFR 84.106(l)(5) | Records: leak inspections | Records of leak inspections must include the date, the method or methods used, a list of the location of each leak identified, and a certification that all visible and accessible parts were inspected. The certified technician must, on conclusion of the service, provide the owner or operator with documentation that meets these requirements. | 3 years | 2026-09-09 |
| 40 CFR 84.106(l)(8), (l)(9) | Records: retrofit or retirement plans and extension requests | Owners or operators must maintain retrofit or retirement plans developed under paragraph (h), and any retrofit or retirement extension requests submitted to EPA under paragraph (i). | 3 years | 2026-09-09 |
| 40 CFR 84.106(l)(10) | Records: mothballing | Owners or operators that suspend the deadlines by mothballing an appliance must keep records documenting when the appliance was mothballed and when additional refrigerant was added to the appliance or isolated component. | 3 years | 2026-09-09 |
| 40 CFR 84.106(l)(13) | Records: reports submitted to EPA | Owners or operators that submit reports to EPA under paragraph (m) must maintain copies of the submitted reports and any responses from EPA. | 3 years | 2026-09-09 |
| 40 CFR 84.106(m) | Reporting: how reports are submitted | All notifications and reports under the leak repair section are submitted electronically using the Agency's applicable reporting platform. | 2026-09-09 | |
| 40 CFR 84.106(m)(4) | Chronic-leak report: the twelve items | The report for an appliance leaking 125 percent or more of its full charge in a calendar year carries: basic identification (owner or operator, facility name and address, appliance ID or description); appliance type; refrigerant type; full charge in pounds; annual percent refrigerant loss; dates of refrigerant addition; amounts added; date of the last successful follow-up verification test; explanation of the cause of the losses; description of repair actions taken; whether a retrofit or retirement plan has been developed and the anticipated date; and a signed statement from an authorized company official. | 2026-09-09 | |
| 40 CFR 84.64(a), (b) and table 1; appendix A to part 84 | Refrigerant GWPs | A regulated substance carries its AIM Act exchange value; a blend is the mass-weighted sum of its constituents; non-HFC constituents take the values in table 1 to 84.64(b). The lookup shows every figure. | 22 refrigerants | 2026-09-04 |
The state overlays
24 entries from the three states with programmes of their own, read from the state's own published text; each renders its overlay page: California, Washington, New York.
The purpose of the subarticle is to reduce emissions of high global warming potential refrigerants from stationary, non-residential refrigeration equipment and from the installation and servicing of stationary refrigeration and air-conditioning appliances using high-GWP refrigerants.
www.law.cornell.edu/regulations/california/17-CCR-95380The programme reaches stationary, non-residential refrigeration systems that require more than 50 pounds of any combination of high-GWP refrigerant, high-GWP meaning a global warming potential of 150 or more. Air-conditioning appliances are outside the definition of refrigeration system, and residential dwellings of four or fewer units are excluded.
www.law.cornell.edu/regulations/california/17-CCR-95382The owner or operator registers each covered facility with the Executive Officer. Systems of 2,000 pounds or more operating before 2012 by March 1, 2012; 200 to 1,999 pounds before 2014 by March 1, 2014; more than 50 and under 200 pounds before 2016 by March 1, 2016; a new system by March 1 of the calendar year after it begins operating; a new owner by March 1 of the year after the change.
www.law.cornell.edu/regulations/california/17-CCR-95383A facility with a system of 200 pounds or more pays an implementation fee: $370 for a system of 2,000 pounds or more, $170 for 200 to 1,999 pounds, due with registration and then by March 1 of each calendar year.
www.law.cornell.edu/regulations/california/17-CCR-95384Systems of 2,000 pounds or more are inspected monthly with a leak detection device, a bubble test or observation of oil residue, unless an automatic leak detection system covers them; 200 to 1,999 pounds once every three months; 50 to 199 pounds annually.
www.law.cornell.edu/regulations/california/17-CCR-95385An automatic leak detection system must accurately detect 10 parts per million and alert the operator at 100 parts per million, or alert the operator at a loss of 50 pounds or 10 percent of the full charge, whichever is less.
www.law.cornell.edu/regulations/california/17-CCR-95385A refrigerant leak must be repaired by a certified technician within 14 days of its detection. Forty-five days where a certified technician or the parts are unavailable with documentation, or an industrial process shutdown is required; 120 days for industrial process refrigeration at a facility under mandatory emissions reporting when the repair requires a shutdown.
www.law.cornell.edu/regulations/california/17-CCR-95386An initial verification test on completion of the repair, and a follow-up verification test on the complete system at normal operating conditions. If the tests show the leak continues, the repair is attempted again within 45 days or a retrofit or retirement plan is prepared within 60 days; after a 45-day repair, a plan within 60 days; after a 120-day repair, a plan within 135 days.
www.law.cornell.edu/regulations/california/17-CCR-95386The owner or operator of a leaking system that is not repaired in time prepares a retrofit or retirement plan and keeps it at the site with the system's information.
www.law.cornell.edu/regulations/california/17-CCR-95387A facility with a system of 200 pounds or more reports each year by March 1 for the previous calendar year: the system information, the service and leak repair information (dates detected and repaired, cause, verification tests, refrigerant charged, the technician), and refrigerant purchased, charged, recovered, stored and shipped for reclamation or destruction. A facility with only 50 to 199 pound systems reports within 60 days of a request.
www.law.cornell.edu/regulations/california/17-CCR-95388Registration information, leak detection records, service and repair records with the documentation for any longer repair period, retrofit or retirement plans, reports, exemption records, refrigerant purchase invoices, reclamation and destruction shipment records, and the full-charge calculation are kept at least five years at the facility and made available on request.
www.law.cornell.edu/regulations/california/17-CCR-95389The refrigerant management programme applies to facilities with a refrigeration or air conditioning system with a full charge of 50 pounds or more that uses a refrigerant with a global warming potential of 150 or more.
app.leg.wa.gov/wac/default.aspx?cite=173-443-105Systems of 1,500 pounds or more operating before 2024 register by March 15, 2024; 200 to 1,499 pounds before 2026 by March 15, 2026; 50 to 199 pounds before 2028 by March 15, 2028; a system starting after those dates by the March 15 following; a new owner by the March 15 following the change; a new facility within three months of operating.
app.leg.wa.gov/wac/default.aspx?cite=173-443-115Year-round systems of 1,500 pounds or more are inspected monthly from January 1, 2024; 200 to under 1,500 pounds quarterly from January 1, 2026; 50 to under 200 pounds annually from January 1, 2028; a system not run year-round within 30 days of startup and quarterly after. An automatic leak detection system that detects 10 parts per million and alerts at 100, or alerts at a loss of 50 pounds or 10 percent of the charge, replaces the schedule; an alert is followed by an inspection within 24 hours.
app.leg.wa.gov/wac/default.aspx?cite=173-443-145The leak rate is calculated at each leak inspection and each time refrigerant is added, by the 12-month rolling average method. The thresholds are 16 percent for retail food refrigeration and cold storage, 24 percent for industrial process refrigeration and 8 percent for air conditioning. Ecology is notified within 30 days of determining an exceedance, and verification test results within 30 days of the repair deadline and of completion.
app.leg.wa.gov/wac/default.aspx?cite=173-443-155A refrigerant leak must be repaired by a certified technician within 14 calendar days of its detection; 45 days where a certified technician or the parts are unavailable or an industrial process shutdown is required; 120 days for industrial process refrigeration at an entity under greenhouse gas reporting. A verification test on completion of any repair, and a follow-up test within 14 days of normal operating conditions if the system was evacuated. If the leak continues, a retrofit or retirement plan or a further repair within double the original time (28, 90 or 240 days).
app.leg.wa.gov/wac/default.aspx?cite=173-443-165A facility with a system of 200 pounds or more using a refrigerant with a GWP of 150 or more reports by March 15 for the previous calendar year, phased in from March 15, 2025 for systems of 1,500 pounds or more and March 15, 2027 for 200 to 1,500 pounds: the system information, the annual leak rate with inspection, detection and repair dates, and refrigerant purchased, charged, recovered, stored and shipped.
app.leg.wa.gov/wac/default.aspx?cite=173-443-185Registration information, leak detection and inspection records, service and repair records, retrofit or retirement plans, reports, exemption applications, refrigerant purchase invoices and reclamation or destruction shipment records are kept at least five years at the facility where the system operates.
app.leg.wa.gov/wac/default.aspx?cite=173-443-195The refrigerant management subpart applies to the owner or operator of commercial stationary refrigeration or air conditioning equipment with a refrigerant charge capacity of 50 pounds or more of a regulated substance, and to supermarket chains as the Part defines them.
www.law.cornell.edu/regulations/new-york/6-NYCRR-494-2.1Equipment of 1,500 pounds or more installed before June 1, 2025 registers by that date; 200 to 1,499 pounds by June 1, 2026; 50 to 199 pounds by June 1, 2028; new equipment by June 1 of the calendar year after it is installed. Registration carries the facility and equipment details and a label on the equipment.
www.law.cornell.edu/regulations/new-york/6-NYCRR-494-2.2Refrigeration equipment of 1,500 pounds or more is inspected monthly, replaced by an automatic leak detection system on or before June 1, 2025; air conditioning of 1,500 pounds or more monthly or by an automatic system; 200 to 1,499 pounds quarterly or by an automatic system; 50 to 199 pounds annually or by an automatic system. Inspections use a calibrated device with 10 parts per million sensitivity; an automatic system alerts at 100 parts per million.
www.law.cornell.edu/regulations/new-york/6-NYCRR-494-2.3A leak must be repaired by a certified technician within 14 days of its detection; 45 days where a certified technician or the parts are unavailable with written documentation or an industrial process shutdown is required; up to 120 days for industrial process refrigeration when manufacturing must stop. An initial verification test follows completion of the repair (the section sets 30 days; 120 for industrial process refrigeration) and a follow-up test within 10 days of normal operating conditions. A leak that continues means another repair within the same period or a retrofit or retirement plan under 494-2.5.
www.law.cornell.edu/regulations/new-york/6-NYCRR-494-2.4An annual report for the previous calendar year, large equipment first by March 31, 2026 and medium equipment by March 31, 2027: the equipment information, the service and leak repair information with leak rates and inspection, detection and repair dates, regulated substance purchases and use, and updated registration information.
www.law.cornell.edu/regulations/new-york/6-NYCRR-494-2.6Registration information, leak inspections with the dates and locations of leaks found, service and repair records naming the person who did the work, retrofit or retirement plans, reports, variance decisions, purchase invoices and reclamation or destruction shipment records are kept five years at the facility and provided within 90 days of a request.
www.law.cornell.edu/regulations/new-york/6-NYCRR-494-2.7How verification works
An entry is a section, a requirement in plain words, the number it turns on where there is one, the primary source, and the date the text was read. The date is the claim: on that day the section said this. When the regulation changes, the entry is reread and the date moves, and every page that cites it moves with it, because pages render from the library rather than repeating it. An entry older than ninety days is a warning on the scoreboard, whether or not the rule changed.
What this page is not: legal advice, a statement about any appliance or business, or a certification. It is the reading list. The comparison is dated the same way for the same reason.